Joint development project with Hitachi Energy: Binder burnout of varistors analysed live for the first time using Neutron CT
15.12.2023
Our tailor-made high-temperature furnace makes it possible to investigate the binder burnout of varistors in-situ. The control system allows freely programmable temperature curves of up to 600°C to be run and the varistor to be tomographed in the process.
The initial results look very promising.
Infrastructure Project
Any question? Feel free to contact us.